A 36.6 m (120 ft) vertical tunnel is at the core of the facility. This tunnel was lifted into place by PSC Crane & Rigging, using two of Modulift’s MOD50 spreader beams to create a four-point lift.
The Steel Operations segment offers hot rolled, cold rolled, and coated steel products; parallel flange beams and channel sections, flat bars, large unequal leg angles, and reinforcing steel bars ...